-
Notifications
You must be signed in to change notification settings - Fork 6
Winter 2014 Schedule
nxrlab edited this page Feb 18, 2014
·
14 revisions
Task | Deliverable | Demo | Demo Date |
---|---|---|---|
Combined carrier and shaft prototype | A single part that fulfills the role of both carrier and shaft | The piece fits properly within the ring gear and around the planetary gears. Simple to manufacture | 2/21 Machine prototype out of plastic |
Battery housing | Battery housing for 5 batteries with wires that connect the batteries in series | The batteries are wired in series supplying a voltage of 16.5 V with the wires neatly placed in the housing | 2/28 dimensions and preliminary drawings for battery housing; 3/7 16.5 V test |
Make a CAD model | CAD drawings and assembly files | Shrink current Gibbot to within 15% of all physical parameters found in Kinea's Gibbot. | 4/4 place all finished CAD drawings in repository. |
3-D print frame | A 3-D printed frame of the Gibbot | An assembled prototype of the frame | 2/28 quote for printed part; 4/11 robot frame |
Generate materials list | materials and vendors documented on wiki | None | 4/4 materials on wiki |
Generate a list of potential vendors to fabricate robot | list of vendors, pricing, lead times, and files needed for fabrication | None | 4/4 submit vendors |