Skip to content

[test] : add unittests for vpc.go file #528

[test] : add unittests for vpc.go file

[test] : add unittests for vpc.go file #528

Triggered via pull request December 19, 2024 20:38
Status Cancelled
Total duration 6m 0s
Artifacts 1

ci.yml

on: pull_request
Fit to window
Zoom out
Zoom in

Annotations

4 errors and 9 warnings
build-test
issues found
e2e-tests
Canceling since a higher priority waiting request for 'ci-refs/pull/281/merge' exists
e2e-tests
The operation was canceled.
e2e-tests
Process completed with exit code 2.
changes
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
changes
'base' input parameter is ignored when action is triggered by pull request event
build-test
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
build-test
Failed to restore: "/usr/bin/tar" failed with error: The process '/usr/bin/tar' failed with exit code 2
docker-build
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
docker-build
281/merge is not a valid semver. More info: https://semver.org/
docker-build
No Docker image version has been generated. Check tags input.
docker-build
No Docker tag has been generated. Check tags input.
e2e-tests
Failed to restore: "/usr/bin/tar" failed with error: The process '/usr/bin/tar' failed with exit code 2

Artifacts

Produced during runtime
Name Size
linode~linode-cloud-controller-manager~NB2RNJ.dockerbuild
27.1 KB