[test] : add unittests for vpc.go file #528
ci.yml
on: pull_request
changes
8s
docker-build
2m 11s
Annotations
4 errors and 9 warnings
build-test
issues found
|
e2e-tests
Canceling since a higher priority waiting request for 'ci-refs/pull/281/merge' exists
|
e2e-tests
The operation was canceled.
|
e2e-tests
Process completed with exit code 2.
|
changes
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
|
changes
'base' input parameter is ignored when action is triggered by pull request event
|
build-test
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
|
build-test
Failed to restore: "/usr/bin/tar" failed with error: The process '/usr/bin/tar' failed with exit code 2
|
docker-build
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
|
docker-build
281/merge is not a valid semver. More info: https://semver.org/
|
docker-build
No Docker image version has been generated. Check tags input.
|
docker-build
No Docker tag has been generated. Check tags input.
|
e2e-tests
Failed to restore: "/usr/bin/tar" failed with error: The process '/usr/bin/tar' failed with exit code 2
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
linode~linode-cloud-controller-manager~NB2RNJ.dockerbuild
|
27.1 KB |
|