Test on Debian Trixie & update RocksDB to 9.3.1 #3545
rust.yml
on: pull_request
Integration
3m 25s
Matrix: Build
Annotations
10 errors and 2 warnings
Build (ubuntu-latest, --locked --no-default-features)
Process completed with exit code 101.
|
Build (windows-latest, --locked)
The job was canceled because "ubuntu-latest_--locked_--" failed.
|
Build (windows-latest, --locked)
The operation was canceled.
|
Build (windows-latest, --locked --no-default-features)
The job was canceled because "ubuntu-latest_--locked_--" failed.
|
Build (windows-latest, --locked --no-default-features)
The operation was canceled.
|
Build (ubuntu-latest, --locked --features metrics_process)
The job was canceled because "ubuntu-latest_--locked_--" failed.
|
Build (ubuntu-latest, --locked --features metrics_process)
The operation was canceled.
|
Build (ubuntu-latest, --locked)
The job was canceled because "ubuntu-latest_--locked_--" failed.
|
Build (ubuntu-latest, --locked)
The operation was canceled.
|
Integration
Process completed with exit code 1.
|
Build (ubuntu-latest, --locked --no-default-features)
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
|
Integration
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
|