Fixes #4390 - Upgrade to Arquillian 1.9.1.Final #145
pr.yml
on: pull_request
codeql
4m 39s
docs
48s
Matrix: build
Annotations
7 errors and 5 warnings
docs
Process completed with exit code 1.
|
build (21, ubuntu-latest)
Process completed with exit code 1.
|
build (21, macos-latest)
The job was canceled because "_21_ubuntu-latest" failed.
|
build (21, macos-latest)
The operation was canceled.
|
build (21, windows-latest)
The job was canceled because "_21_ubuntu-latest" failed.
|
build (21, windows-latest)
The operation was canceled.
|
codeql
Process completed with exit code 1.
|
docs
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
|
build (21, ubuntu-latest)
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
|
codeql
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
|
codeql
1 issue was detected with this workflow: Please specify an on.push hook to analyze and see code scanning alerts from the default branch on the Security tab.
|
codeql
Unable to validate code scanning workflow: MissingPushHook
|