doc: update changelog for 1.5.1 #95
rust.yml
on: push
Matrix: build_all_targets
Matrix: build_library_msrv
Matrix: style_checks
Annotations
8 errors and 3 warnings
build_library_msrv (macos-latest)
Process completed with exit code 1.
|
build_library_msrv (macos-latest)
The job was canceled because "macos-latest_2" failed.
|
build_library_msrv (macos-latest)
Process completed with exit code 1.
|
build_library_msrv (ubuntu-latest)
The job was canceled because "macos-latest_2" failed.
|
build_library_msrv (ubuntu-latest)
The operation was canceled.
|
style_checks (stable)
Process completed with exit code 101.
|
style_checks (nightly)
The job was canceled because "stable" failed.
|
style_checks (nightly)
The operation was canceled.
|
style_checks (stable)
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
|
build_all_targets (stable)
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
|
build_all_targets (nightly)
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
|