EDSC-4076: Integrate a linter for react-testing-library before the number of those gets too large in EDSC #2927
Annotations
5 errors and 6 warnings
jest (lts/hydrogen, 1/3)
Process completed with exit code 1.
|
jest (lts/hydrogen, 3/3)
The job was canceled because "lts_hydrogen_1_3" failed.
|
jest (lts/hydrogen, 3/3)
The operation was canceled.
|
jest (lts/hydrogen, 2/3)
The job was canceled because "lts_hydrogen_1_3" failed.
|
jest (lts/hydrogen, 2/3)
The operation was canceled.
|
eslint (lts/hydrogen)
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
|
jest (lts/hydrogen, 1/3)
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
|
playwright (lts/hydrogen, 2/3)
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
|
playwright (lts/hydrogen, 1/3)
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
|
playwright (lts/hydrogen, 1/3)
No files were found with the provided path: playwright-report/
test-results/. No artifacts will be uploaded.
|
playwright (lts/hydrogen, 3/3)
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
playwright-report-1
|
959 KB |
|
playwright-report-2
|
906 KB |
|