Go 1.21 and dependencies #13
test.yml
on: pull_request
Matrix: test / test
Matrix: integration-test / run
Matrix: lint / lint
test
/
finish
4s
Annotations
11 errors
integration-test / run (macos-12, 1.20.x)
Process completed with exit code 2.
|
integration-test / run (macos-12, 1.21.x)
The job was canceled because "macos-12_1_20_x" failed.
|
integration-test / run (macos-12, 1.21.x)
The operation was canceled.
|
integration-test / run (windows-2022, 1.21.x)
The job was canceled because "macos-12_1_20_x" failed.
|
integration-test / run (windows-2022, 1.21.x)
The operation was canceled.
|
integration-test / run (windows-2022, 1.20.x)
The job was canceled because "macos-12_1_20_x" failed.
|
integration-test / run (windows-2022, 1.20.x)
The operation was canceled.
|
integration-test / run (ubuntu-22.04, 1.20.x)
The job was canceled because "macos-12_1_20_x" failed.
|
integration-test / run (ubuntu-22.04, 1.20.x)
The operation was canceled.
|
integration-test / run (ubuntu-22.04, 1.21.x)
The job was canceled because "macos-12_1_20_x" failed.
|
integration-test / run (ubuntu-22.04, 1.21.x)
The operation was canceled.
|