Skip to content

Merge pull request #76 from cryspen/jonas/top-level-mpc #151

Merge pull request #76 from cryspen/jonas/top-level-mpc

Merge pull request #76 from cryspen/jonas/top-level-mpc #151

Triggered via push June 5, 2024 06:51
Status Failure
Total duration 6h 0m 24s
Artifacts

rust.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

4 errors and 1 warning
build (windows-latest)
The job running on runner GitHub Actions 19 has exceeded the maximum execution time of 360 minutes.
build (windows-latest)
The operation was canceled.
build (macos-latest)
The job running on runner GitHub Actions 3 has exceeded the maximum execution time of 360 minutes.
build (macos-latest)
The operation was canceled.
build (ubuntu-latest)
Node.js 16 actions are deprecated. Please update the following actions to use Node.js 20: actions/checkout@v3. For more information see: https://github.blog/changelog/2023-09-22-github-actions-transitioning-from-node-16-to-node-20/.