Skip to content

Merge pull request #501 from canonical/feat-allure-reports #2182

Merge pull request #501 from canonical/feat-allure-reports

Merge pull request #501 from canonical/feat-allure-reports #2182

Triggered via push December 20, 2024 13:54
Status Failure
Total duration 6h 0m 47s
Artifacts

ci_pipeline.yaml

on: push
lint-report  /  lint-report
17s
lint-report / lint-report
static-analysis  /  static-analysis
17s
static-analysis / static-analysis
integration-test  /  integration-test
6h 0m
integration-test / integration-test
Matrix: codeql / CodeQL Analysis
create-issue
2s
create-issue
sync-issues  /  Update Issue
0s
sync-issues / Update Issue
Fit to window
Zoom out
Zoom in

Annotations

2 errors and 3 warnings
integration-test / integration-test
The job running on runner openstack-amd64-large-ps6-7-ece5add99605 has exceeded the maximum execution time of 360 minutes.
integration-test / integration-test
The operation was canceled.
codeql / CodeQL Analysis (python)
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
create-issue
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
sync-issues / Update Issue
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636