Anat Pipelines Tests #42
test_pipelines_anat.yml
on: schedule
test-t1-linear-MacOS
14m 57s
test-t1-volume-MacOS
24m 56s
test-t1-linear-Linux
10m 6s
test-t1-volume-Linux
12h 0m
Annotations
4 errors
test-t1-linear-MacOS
The self-hosted runner: mac-mini-aramis lost communication with the server. Verify the machine is running and has a healthy network connection. Anything in your workflow that terminates the runner process, starves it for CPU/Memory, or blocks its network access can cause this error.
|
test-t1-volume-MacOS
The self-hosted runner: mac-mini-aramis lost communication with the server. Verify the machine is running and has a healthy network connection. Anything in your workflow that terminates the runner process, starves it for CPU/Memory, or blocks its network access can cause this error.
|
test-t1-volume-Linux
The job running on runner gh-runner-2 has exceeded the maximum execution time of 720 minutes.
|
test-t1-volume-Linux
The operation was canceled.
|