-
Notifications
You must be signed in to change notification settings - Fork 1
Resource Model
The Resource Modeler allows the modeling of resources which are an extension of fCM made to enable a more detailed planning support for construction processes. Resources are instances of roles that are modeled in the Role Modeler. The list of available resources is modeled as an UML object diagram where each resource is an object with a Name and the attributes Capacity (amount of available workers), Roles (which are consistent with the Role Model), Availability Start and Availability End (to describe the timespan in which the resource is available to work).
Each Resource must have a positive capacity and hold at least one role (multiple roles are possible). Resources must not specify the availability, thus being always available. When defining an availability, the start time and end time must be set (closed interval). The availability end must be greater or equal to the non negative availability start. The underlying time unit is not specified but abstract and relative to the starting point of plan generation.
Resources of the example
Background
General Characteristics of fCM (> old wiki)
Example Use Case Construction Process Goal Modeling for-Construction-Modeling
Modeling
Data Modeler
Fragment Modeler
Objective Modeler
Dependency Modeler
Resource Modeler
Role Modeler
General (> old wiki)
Fragment Model
Dependency Model
Objective Model
Consistency (> old wiki)