Skip to content

Improve error handling and logging #221

Improve error handling and logging

Improve error handling and logging #221

Triggered via pull request November 8, 2023 22:28
Status Failure
Total duration 3m 15s
Artifacts

test.yml

on: pull_request
Matrix: integration-test
Matrix: unit-test
Fit to window
Zoom out
Zoom in

Annotations

7 errors
integration-test (3.11, 1.14.0)
Process completed with exit code 1.
integration-test (3.11, 1.13.0)
The job was canceled because "_3_11_1_14_0" failed.
integration-test (3.11, 1.13.0)
Process completed with exit code 1.
integration-test (3.6.15, 1.14.0)
The job was canceled because "_3_11_1_14_0" failed.
integration-test (3.6.15, 1.14.0)
Process completed with exit code 1.
integration-test (3.6.15, 1.13.0)
The job was canceled because "_3_11_1_14_0" failed.
integration-test (3.6.15, 1.13.0)
The operation was canceled.