Skip to content

fix(acceptance): fix flakey wallet test #39221

fix(acceptance): fix flakey wallet test

fix(acceptance): fix flakey wallet test #39221

Triggered via pull request December 26, 2024 11:31
Status Cancelled
Total duration 9m 45s
Billable time 19m
Artifacts 3

integration.yml

on: pull_request
pre_check  /  Check preconditions and cancel previous jobs
7s
pre_check / Check preconditions and cancel previous jobs
Matrix: getting-started
deployment-test
9m 22s
deployment-test
test-docker-build
9m 11s
test-docker-build
test-multichain-e2e  /  ...  /  multichain-e2e
9m 19s
test-multichain-e2e / Multichain E2E (Orchestration API) / multichain-e2e
test-multichain-e2e  /  ...  /  multichain-e2e
8m 7s
test-multichain-e2e / Multichain E2E (Fast USDC) / multichain-e2e
finalize-integration-result
0s
finalize-integration-result
Fit to window
Zoom out
Zoom in

Annotations

14 errors and 1 warning
getting-started (registry/npm)
Canceling since a higher priority waiting request for 'Integration tests-refs/pull/10775/merge' exists
getting-started (registry/npm)
The operation was canceled.
getting-started (registry/npx)
Canceling since a higher priority waiting request for 'Integration tests-refs/pull/10775/merge' exists
getting-started (registry/npx)
The operation was canceled.
getting-started (link-cli/yarn)
Canceling since a higher priority waiting request for 'Integration tests-refs/pull/10775/merge' exists
getting-started (link-cli/yarn)
The operation was canceled.
getting-started (registry/yarn)
Canceling since a higher priority waiting request for 'Integration tests-refs/pull/10775/merge' exists
getting-started (registry/yarn)
The operation was canceled.
test-docker-build
Canceling since a higher priority waiting request for 'Integration tests-refs/pull/10775/merge' exists
test-docker-build
The operation was canceled.
test-multichain-e2e / Multichain E2E (Fast USDC) / multichain-e2e
Canceling since a higher priority waiting request for 'Integration tests-refs/pull/10775/merge' exists
test-multichain-e2e / Multichain E2E (Orchestration API) / multichain-e2e
Canceling since a higher priority waiting request for 'Integration tests-refs/pull/10775/merge' exists
deployment-test
Canceling since a higher priority waiting request for 'Integration tests-refs/pull/10775/merge' exists
deployment-test
The operation was canceled.
pre_check / Check preconditions and cancel previous jobs
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636

Artifacts

Produced during runtime
Name Size
deployment-test-results-20241226T114111
25.6 MB
multichain-e2e-logs-agoric-multichain-testing-12503353267-multichain-e2e
1.55 KB
multichain-e2e-logs-agoric-multichain-testing-fusdc-12503353267-multichain-e2e
1.56 KB